
A local school's fixed-speed booster set had reached the end of its life. Fixed-speed pumps run flat out whenever there is any demand, so the school needed a reliable, more efficient replacement.
We replaced it with a new DAB Esybox Max triple booster set and modified the existing pipework in the plant room to suit. The three variable-speed pumps adjust their output to match demand across the school and share the work between them, so the supply keeps running if one pump ever needs attention.
- SiteLocal school, Jersey
- ReplacedEnd-of-life fixed-speed booster set
- InstalledDAB Esybox Max triple booster set
- WorkPipework modified to suit, installed and commissioned


