We were asked to survey two booster sets supplying a large apartment complex. On the site visit we noticed several issues that were putting unnecessary stress on the system.
After a thorough investigation, we advised that the settings be adjusted to suit the site, the top bearings replaced, and the mechanical seals replaced where needed.
Eleven months later, after our report had been rejected by the existing contractor, we were called in to fix the issues. Once the faults were put right, residents noticed the difference straight away, and the pumps could finally breathe a sigh of relief.
- SiteLarge apartment complex
- SurveyedTwo booster sets
- FoundWrong settings, worn bearings and seals
- WorkSettings adjusted, top bearings and seals replaced